Boeing | Dreamlifter Operations Center 88-20 Expansion
North Charleston, SC
Project Size: 90,000 ft2
Cost: $19.4 Million
Project Description:
Building EnergetiCx provided construction commissioning services for the expansion of the Boeing Dreamlifter Operations Center at Building 88-20. Building 88-20 is the mid-body factory for the Boeing 787 aircraft. The expansion included an additional bay to the existing facility that included a ground level for administration and production and three mezzanine levels that included MEP support spaces and additional office space.
Commissioned Systems:
- Chilled Water Piping
- Air Handling Systems
- VAV Terminal Units
- Exhaust Systems
- Building Automation System
- Domestic Hot Water Systems
- Plumbing Systems
- Lighting Control Systems
- Electrical Switchgear
- Electrical Transformers
- Electrical Distribution Panels
- Hangar Doors